Bishops Court, Warrington

Bishops Court, Warrington

blank

The brief

Stop recurrent leaks, improve thermal performance, and reduce ongoing maintenance costs for a busy commercial building.

Our solution

We installed a multi-layer built-up bituminous roof comprising:

  • Vapour dispersion layer for controlled moisture management.

  • High-performance PIR insulation to reduce heat loss and improve energy efficiency.

  • Reinforced bituminous layers finished with a mineral cap sheet for UV and weather protection.
    All penetrations, perimeters and outlets were detailed to manufacturer standards, with QA checks at each stage.

Delivery & challenges

  • Live site coordination: Sequenced works with multiple contractors to prevent clashes and keep the programme on track.

  • Variable weather: Adjusted phasing around warm spells and rainfall to protect the deck and ensure dry, high-quality bonds.

  • Work at height: Operated under strict RAMS, edge protection and hot-works controls to maintain productivity and compliance.

Results

  • Reliable waterproofing and leak elimination.

  • Better energy efficiency thanks to the PIR warm-roof build-up.

  • Low maintenance system with durable mineral finish.

  • 20–30 year expected service life for long-term value.